Customer concern
Equipment connection begins with the nameplate and manufacturer instructions, then verifies the circuit, protection, disconnecting, grounding, controls and other-trade responsibilities.

GORIGHT SERVICE
Fixed-equipment connections verified against nameplate data, circuit capacity, protection, disconnecting and manufacturer instructions.
Pricing is based on nameplate data, circuit requirements and scopeSubject to verified site conditions and a written scope.
Equipment connection begins with the nameplate and manufacturer instructions, then verifies the circuit, protection, disconnecting, grounding, controls and other-trade responsibilities.
Motors and pumps may require full-load current, starting current, conductor, short-circuit protection, overload protection, disconnecting and starting-voltage-drop checks.
Your investment covers professional review, applicable calculations, safe isolation, coordinated selection, skilled installation or assessment, testing, documentation, licensing, insurance and accountability within the authorized scope.
Concealed damage, difficult or destructive routing, finish restoration, hazardous-material work, utility work, engineering and newly discovered conditions are outside the initial scope unless expressly included. Additional work requires authorization.
CEC Sections 2, 4, 8, 10, 12, 14, 26 and 28 as applicable; certified equipment instructions; other-trade commissioning boundaries.
Important: Final Code rules, permit classification, inspection, utility and equipment requirements depend on the verified installation. These references are navigation aids and do not constitute project approval.
Immediate electrical danger: leave the area and call 911. Website forms do not provide emergency dispatch.