Serving Saint John, Rothesay, Quispamsis & Grand Bay-WestfieldNB Group 3 Licence 908539

GORIGHT SERVICE

Commercial Service and Tenant Improvements

Commercial alterations, equipment connections and service work planned around occupancy, phase loading, fault duty and shutdown requirements.

Starting at $10.00 per sq. ft., before HSTSubject to verified site conditions and a written scope.
Electrician reviewing commercial distribution equipment during tenant-improvement electrical work

Customer concern

Commercial work must fit the occupancy, base-building system, connected and demand loads, phase balance, fault duty and operational shutdown needs.

What GoRight evaluates

  • Occupancy, equipment, HVAC and motor loads
  • Phase and neutral loading, harmonics and available fault current
  • Service, feeder, transformer and panel capacity

Professional work stages

  1. 1. Define tenant and base-building responsibilities
  2. 2. Develop equipment and load schedule
  3. 3. Review fault duty, coordination and capacity
  4. 4. Plan shutdown, permit and construction sequence
  5. 5. Install, commission, identify and document

Calculations and design decisions

Phase balance, neutral loading, available fault current, interrupting ratings and coordination can materially affect equipment selection and project scope.

What your investment covers

Your investment covers professional review, applicable calculations, safe isolation, coordinated selection, skilled installation or assessment, testing, documentation, licensing, insurance and accountability within the authorized scope.

What you may receive

  • Written scope or findings
  • Applicable calculation, test or coordination summary
  • Recommendations, limitations and next steps

Exclusions and price-changing conditions

Concealed damage, difficult or destructive routing, finish restoration, hazardous-material work, utility work, engineering and newly discovered conditions are outside the initial scope unless expressly included. Additional work requires authorization.

Code, permit and equipment references

CEC Sections 2, 4, 6, 8, 10, 12, 14, 26, 28 and 30; plan approval or engineering where required; utility and base-building coordination.

Important: Final Code rules, permit classification, inspection, utility and equipment requirements depend on the verified installation. These references are navigation aids and do not constitute project approval.

Immediate electrical danger: leave the area and call 911. Website forms do not provide emergency dispatch.