Customer concern
Safe backup power depends on load selection, motor starting, transfer equipment, neutral treatment and positive isolation from the utility supply.

GORIGHT SERVICE
Backup-power connections designed around running load, motor starting, transfer equipment and safe utility isolation.
Starting at $1,850, before HSTSubject to verified site conditions and a written scope.
Safe backup power depends on load selection, motor starting, transfer equipment, neutral treatment and positive isolation from the utility supply.
Capacity must cover running load, starting demand and sequencing. The transfer arrangement must prevent generator and utility sources from being connected together.
Your investment covers professional review, applicable calculations, safe isolation, coordinated selection, skilled installation or assessment, testing, documentation, licensing, insurance and accountability within the authorized scope.
Concealed damage, difficult or destructive routing, finish restoration, hazardous-material work, utility work, engineering and newly discovered conditions are outside the initial scope unless expressly included. Additional work requires authorization.
CEC Sections 2, 4, 8, 10, 12, 14 and 46; permit and inspection; generator and transfer-equipment instructions; utility isolation requirements.
Important: Final Code rules, permit classification, inspection, utility and equipment requirements depend on the verified installation. These references are navigation aids and do not constitute project approval.
Immediate electrical danger: leave the area and call 911. Website forms do not provide emergency dispatch.